0.2 FEE Integration and Maintenance

 

0.2.1 Expected Deliverables from the Project

 

       Boards: CFEB, AFEB, ALCT, LVDB, LVMB

       Cables: CSC-CFEB CSC-AFEB AFEB-ALCT

              Boards: DMB,TMB,CCB,RIM(Rpc interface module)

              Cables: CFEB-DMB CFEB-TMB LVMB-DMB RPC-RIM

                           ALCT-TMB LVDB-CFEB LVDB-ALCT

                           Fiber: CCB-TTC TMB-Trigger

Crate controller for interfacing DCS to VME boards.

        Boards: VME Crate Controller

        Fiber: Ethernet

              Boards: DDU, DCC

              Fiber: DAQMB-DDU

               Boards: VME Crate Controller (Bit3)

               Fiber: DDU-PC

              Cable: ethernet-VME controller, additional hubs and switches envisioned,

              coax connection to LTC

 

 

 

 

 

 

 

 

 

 

0.2.2 Overall Goals and Major Deliverables

 

   System & Installation Issues FE:

 

 

    System & Installation Issues Peripheral Crate:

 

 

    System & Installation Issues Counting House:

 

 

   Maintenance FE Electronics:

 

 

Maintenance Peripheral Crate Electronics

 

 

Maintenance Counting House Electronics

 

 

Bookkeeping

 

 

0.2.3 Major Milestones