Man
Power Needs FEE Integration and Maintenance
0.2 FEE Integration and
Maintenance
0.2.2 Overall Goals and Major
Deliverables
System & Installation Issues FE:
CFEB hardware/software expert physicist FY04-09 60% OSU
AFEB hardware/software expert, physicist FY04-09 60% CMU
ALCT/TMB electronics/software expert, physicists FY04-09 100
% UCLA
Electronics/Firmware/software engineer FY04 20% FY05-09
40% ?
System & Installation Issues Peripheral Crate:
DMB/D360 hardware/software expert physicist FY04-09 40% OSU
ALCT/TMB electronics/software expert, physicists FY04-09 40
% UCLA
CCB electronics/software expert, physicist FY04-09 100% Rice
Electronics/Firmware/software engineer FY04 10% FY05-09
20%
System & Installation Issues Counting House:
EMU DAQ/DDU/DCC expert, physicists FY04-FY09 100 % OSU
EMU Trigger controls expert, physicists FY04-FY09 100 % UCLA
Electronics/Firmware/software engineer FY04 20% FY05-09 40%
Maintenance FE Electronics
Electronics Engineer CFEB FY05-07 50% FY08 37.5% FY09 25% OSU
Electronics Engineer AFEB FY04 8% FY05-FY07 25% FY08 20%
FY09 15% CMU
Electronics Engineer ALCT FY05 30% FY06 60 % FY07 60% FY08
45%
FY09 30% UCLA
PSL Electronics Engineer LV/LVDB FY04 8% FY05-FY07 15% FY08
10%
FY09 7% Wisconsin
Electronics Tech FY04-FY09 5% Davis
CERN Technician FY04-FY09 50%
Electronics Engineer DMB/D360 FY05-07 30% FY08 22.5% FY09 15%
OSU
Electronics Engineer TMB FY05 40% FY06 40 % FY07 40% FY08 30%
FY09 20% UCLA
Electronics Engineer FY04 8% FY05-FY07 50% FY08 40% FY09 25%
Rice
CERN Technician FY04-FY09 30%
Electronics Engineer DDU/DCC FY05-07 20% FY08 15% FY09 10%
OSU
CERN Technician FY04-FY09 20%
Post Doc FY04-FY09 100% UCD
Where
numbers came from:
The following assignments of manpower are a starting point for discussion.
Using the last draft of EMU M&O Document 8/19/2002 I
extracted personnel related to electronics. A list of these persons is shown
below. I have divided most of these people among the new M&O task. Some personnel in the old scheme were in a
grey area where they are split between old and new tasks. These include people
working in EMU Repair, Testing, and R&D
Facilities and people working in the EMU Local DAQ/Calibration/OnlineMonitoring
Task. Such grey areas should be part of future discussions.
EMU M&O Document 8/19/2002
On-site
electronics/firmware/software support
CFEB/DMB/DDU/D360 hardware/software expert physicist FY04-09 100% OSU
AFEB hardware/software expert, physicist FY04-09 100% CMU
ALCT/TMB electronics/software expert, physicists FY04-09 100
% UCLA
CCB electronics/software expert, physicist FY04-09 100% Rice
Electronics/Firmware/software engineer FY04 50% FY05-09
100% ?
DAQ/Trigger Detector Controls
On-site EMU DAQ/Trigger controls expert, physicists
FY04-FY09 100 % OSU
On-site EMU DAQ/Trigger controls expert, physicists
FY04-FY09 100 % UCLA
EMU Local
DAQ/Calibration/OnlineMonitoring Task
On-site EMU Local DAQ/Calibration expert FY04-FY09 100% OSU
Software Engineer FY04 50% FY05-FY09 100%
EMU Repair, Testing, and R&D
Facilities (Chambers+Electronics)
Technician FY03-FY08 100 %
Computer Maintenance
Post Doc FY04-FY09 100% UCD
CERN tech (Electronics)
Technician FY04-FY09 100%
Offsite-Chamber Electronics
Maintenance
CFEB/DMB/DDU/D360
Electronics Engineer FY05-07 100% FY08 75% FY09 50% OSU
AFEB
Electronics Engineer FY04 8% FY05-FY07 25% FY08 20% FY09 15%
CMU
ALCT/TMB
Electronics Engineer FY05 50% FY06 100 % FY07 100% FY08 75%
FY09 50%
UCLA
CCB
Electronics Engineer FY04 8% FY05-FY07 50% FY08 40% FY09 25%
Rice
LVDB+LV
PSL Electronics Engineer FY04 8% FY05-FY07 15% FY08 10% FY09
7%
Wisconsin
LVMB
Electronics Tech FY04-FY09 5% Davis