Home

Histograms: (2007)


Muon Runs:

Current standard TCD/CVD settings.

Ice Data, including CPT runs:

  • Dec 19: Launch muon runs with fixed standard TCD and flight CVD HV settings.
  • Dec 17: Aborted launch muon run with standard TCD and flight CVD HV settings.
  • Dec 12: Muon runs with flight CVD settings.
    Hang Test!
  • Dec 04: Muon run with up-to-date TCD/CVD settings.
    Final CDM CPT/Instrument LPT.:
  • Dec 01: Muon run with up-to-date TCD/CVD settings while discharging batteries and then under maximum shunt power conditions (dissipate extra power supplied by solar panels with full batteries).
  • Nov 30: Muon run with new correct TCD/CVD settings while charging battery.
  • Nov 29: Muon runs with almost and new correct TCD/CVD settings under matched power conditions (solar panels supply as much power as the system needs).
  • Initial Muon Runs:
  • Nov 26: Long-duration muon run. Presented is 1 hour (11).
  • Nov 24: Multiple runs, adjusting PMT0 thresholds to raise its statistics to the level of the other PMTs.
  • Nov 19: Multiple runs, including with lowered CVD HV and with raised TCD HV.
  • Nov 17: CPT muon runs (con't).
  • Nov 16: Extended muon run.
  • Nov 15: CPT muon runs.
  • Nov 13: First data on Ice.

Wallops Data, including LPT muon runs:

Flight Data: