Muon Runs:
Current standard TCD/CVD settings.
Ice Data, including CPT runs:
- Dec 19: Launch muon runs with fixed standard TCD and flight CVD HV settings.
- Dec 17: Aborted launch muon run with standard TCD and flight CVD HV settings.
- Dec 12: Muon runs with flight CVD settings.
Hang Test!
- Dec 04: Muon run with up-to-date TCD/CVD settings.
Final CDM CPT/Instrument LPT.:
- Dec 01: Muon run with up-to-date TCD/CVD settings while discharging batteries and then under maximum shunt power conditions (dissipate extra power supplied by solar panels with full batteries).
- Nov 30: Muon run with new correct TCD/CVD settings while charging battery.
- Nov 29: Muon runs with almost and new correct TCD/CVD settings under matched power conditions (solar panels supply as much power as the system needs).
Initial Muon Runs:
- Nov 26: Long-duration muon run. Presented is 1 hour (11).
- Nov 24: Multiple runs, adjusting PMT0 thresholds to raise its statistics to the level of the other PMTs.
- Nov 19: Multiple runs, including with lowered CVD HV and with raised TCD HV.
-
Nov 17: CPT muon runs (con't).
-
Nov 16: Extended muon run.
-
Nov 15: CPT muon runs.
-
Nov 13: First data on Ice.
Wallops Data, including LPT muon runs:
Flight Data:
|